Funding delay looms for EU Framework programme
Alison Abbott
Nature, 1997, vol. 390, issue 6657, 208-208
Abstract:
munich Approval for the European Union s fifth five-year Framework programme of research (FP5), due to begin towards the end of next year, is likely to be delayed.
Date: 1997
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.nature.com/articles/36661 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:nat:nature:v:390:y:1997:i:6657:d:10.1038_36661
Ordering information: This journal article can be ordered from
https://www.nature.com/
DOI: 10.1038/36661
Access Statistics for this article
Nature is currently edited by Magdalena Skipper
More articles in Nature from Nature
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().