Toward an Appropriate Measure of Uncertainty in a Risk Programming Model
William T. McSweeny,
David E. Kenyon and
Randall Kramer
American Journal of Agricultural Economics, 1987, vol. 69, issue 1, 87-96
Abstract:
The measure of uncertainty in a risk-programming problem has long posed a dilemma. The use of the variance of realized returns assumes that the distribution of realized returns is the same as the distribution anticipated by the decision maker prior to the start of production. Rejection of this maintained hypothesis requires either direct elicitation of these distributions or construction of another measure from realized data. A mean-squared forecast error is considered an appropriate measure. Optimal solutions to a quadratic risk-programming problem are obtained using this measure and compared to those obtained using traditional measures.
Date: 1987
References: Add references at CitEc
Citations: View citations in EconPapers (6)
Downloads: (external link)
http://hdl.handle.net/10.2307/1241309 (application/pdf)
Access to full text is restricted to subscribers.
Related works:
Working Paper: Towards an Appropriate Measure of Uncertainty in a Risk Programming Model (1985) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:oup:ajagec:v:69:y:1987:i:1:p:87-96.
Access Statistics for this article
American Journal of Agricultural Economics is currently edited by Madhu Khanna, Brian E. Roe, James Vercammen and JunJie Wu
More articles in American Journal of Agricultural Economics from Agricultural and Applied Economics Association Contact information at EDIRC.
Bibliographic data for series maintained by Oxford University Press ().