EconPapers    
Economics at your fingertips  
 

Problems with contracting out government services: lessons from orderly services at SCGH

Anthony Boardman and Erica Susan Hewitt

Industrial and Corporate Change, 2004, vol. 13, issue 6, 917-929

Abstract: This paper identifies and discusses the problems associated with contracting out labor-intensive government services. It examines in detail the contracting out of the orderly service at Sir Charles Gairdner Hospital (SCGH) in Western Australia and its subsequent return to in-house delivery. When the orderly service was contracted out, the result was poor in terms of cost, quality and externalities. Subsequent return of the service to in-house provision reduced costs and improved quality. The problems that led to failure of contracting out and subsequent success of in-house provision can be explained in terms of transaction cost economics. Copyright 2004, Oxford University Press.

Date: 2004
References: Add references at CitEc
Citations: View citations in EconPapers (4)

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:oup:indcch:v:13:y:2004:i:6:p:917-929

Ordering information: This journal article can be ordered from
https://academic.oup.com/journals

Access Statistics for this article

Industrial and Corporate Change is currently edited by Josef Chytry

More articles in Industrial and Corporate Change from Oxford University Press and the Associazione ICC Oxford University Press, Great Clarendon Street, Oxford OX2 6DP, UK.
Bibliographic data for series maintained by Oxford University Press ().

 
Page updated 2025-03-19
Handle: RePEc:oup:indcch:v:13:y:2004:i:6:p:917-929