Planning under Incomplete Information and the Ratchet Effect
Xavier Freixas,
Roger Guesnerie () and
Jean Tirole
The Review of Economic Studies, 1985, vol. 52, issue 2, 173-191
Abstract:
Central planning of production is usually performed under asymmetric information which leads to use of an incentive scheme. As the planner revises the scheme over time to take into account information provided by the firm's performance, this induces firms to underproduce to avoid more demanding schedules in the future—the ratchet effect. This paper explores this phenomenon under the realistic assumption that the planner cannot commit himself to a revision procedure. We show that the ratchet effect exists, in the sense that the planner may choose a scheme which is suboptimal from a static viewpoint in order to induce revelation, with the marginal price of output exceeding its optimal static value.
Date: 1985
References: Add references at CitEc
Citations: View citations in EconPapers (266)
Downloads: (external link)
http://hdl.handle.net/10.2307/2297615 (application/pdf)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:oup:restud:v:52:y:1985:i:2:p:173-191.
Access Statistics for this article
The Review of Economic Studies is currently edited by Thomas Chaney, Xavier d’Haultfoeuille, Andrea Galeotti, Bård Harstad, Nir Jaimovich, Katrine Loken, Elias Papaioannou, Vincent Sterk and Noam Yuchtman
More articles in The Review of Economic Studies from Review of Economic Studies Ltd
Bibliographic data for series maintained by Oxford University Press ().