Project Evaluation and Uncertainty in Practice: A Statistical Analysis of Rate-of-Return Divergences of 1,015 World Bank Projects
Gerhard Pohl and
Dubravko Mihaljek ()
The World Bank Economic Review, 1992, vol. 6, issue 2, 255-77
Abstract:
This article analyzes the World Bank's experience with project evaluation for a sample of l,015 projects by comparing estimated rates of return at appraisal with reestimated rates of return when construction works are completed, usually 5 to 10 years after appraisal. The analysis highlights the high degree of uncertainty in project analysis. A wide range of variables has been introduced to explain the observed divergence in appraisal and reestimated rates of return, but only a relatively small part of the divergence can be explained, even with the benefit of hindsight. Project analysis thus has to cope with a large degree of uncertainty, which the traditional methods of project evaluation and selection have not been able to reduce. Copyright 1992 by Oxford University Press.
Date: 1992
References: Add references at CitEc
Citations: View citations in EconPapers (30)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:oup:wbecrv:v:6:y:1992:i:2:p:255-77
Ordering information: This journal article can be ordered from
https://academic.oup.com/journals
Access Statistics for this article
The World Bank Economic Review is currently edited by Eric Edmonds and Nina Pavcnik
More articles in The World Bank Economic Review from World Bank Oxford University Press, Great Clarendon Street, Oxford OX2 6DP, UK. Contact information at EDIRC.
Bibliographic data for series maintained by Oxford University Press ().