Estimating the laboriousness of IT projects
Odhadování pracnosti IT projektů
Miroslav Král
Acta Informatica Pragensia, 2012, vol. 2012, issue 1, 32-40
Abstract:
A large number of different methods in the field of estimation of IS/IT projects have been developed in past years. Those methods should be used with regard to several factors. The choice and the application of an estimation method should take into consideration the current phase of each project and the wide variety of external factors, whose composition and intensity are very diverse and individual. The accuracy of the estimation considerably influences the success of the whole project. This article aims to analyse the principles, which are used by methods for effort estimation, and finding strong and weak aspects of these methods.
Keywords: Estimating methods; Project laboriousness; CPM; PERT; CCPM; COCOMO; FPA; UCP; metody odhadování; pracnost projektu (search for similar items in EconPapers)
Date: 2012
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://aip.vse.cz/doi/10.18267/j.aip.3.html (text/html)
http://aip.vse.cz/doi/10.18267/j.aip.3.pdf (application/pdf)
free of charge
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:prg:jnlaip:v:2012:y:2012:i:1:id:3:p:32-40
Ordering information: This journal article can be ordered from
Redakce Acta Informatica Pragensia, Katedra systémové analýzy, Vysoká škola ekonomická v Praze, nám. W. Churchilla 4, 130 67 Praha 3
http://aip.vse.cz
DOI: 10.18267/j.aip.3
Access Statistics for this article
Acta Informatica Pragensia is currently edited by Editorial Office
More articles in Acta Informatica Pragensia from Prague University of Economics and Business Contact information at EDIRC.
Bibliographic data for series maintained by Stanislav Vojir ().