Study of the Effect of the Selected Groups of Risks on IT Projects
Halina Tańska and
Agnieszka Władzińska
Additional contact information
Halina Tańska: Uniwersytet Warmińsko-Mazurski
Agnieszka Władzińska: ZETO Softvare, Olsztyn
Collegium of Economic Analysis Annals, 2017, issue 45, 45-56
Abstract:
There are many methodologies for calculating risk in the implementation of projects. The authors of the article present the chosen method for the estimation, which is tailored to the individual needs of a team performing IT projects and is the resultant of the recommended methods of risk analysis. At the same time, they make an attempt to study how the selected group of risks affect projects, what is the difference between them and what the levels of risk and the effects of risk are, depending on the character of a project, the type of the customer, the type of implementation or complexity of a team.
Keywords: risks; group of risks; risk management plan (search for similar items in EconPapers)
Date: 2017
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://rocznikikae.sgh.waw.pl/p/roczniki_kae_z45_03.pdf Full text (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:sgh:annals:i:45:y:2017:p:45-56
Access Statistics for this article
Collegium of Economic Analysis Annals is currently edited by Joanna Plebaniak, Beata Czarnacka-Chrobot
More articles in Collegium of Economic Analysis Annals from Warsaw School of Economics, Collegium of Economic Analysis Contact information at EDIRC.
Bibliographic data for series maintained by Michał Bernardelli ().