Correction to: An extension of the general lot-sizing and scheduling problem (GLSP) with time-dependent energy prices
Matthias Gerhard Wichmann (),
Christoph Johannes and
Thomas Stefan Spengler
Additional contact information
Matthias Gerhard Wichmann: Technische Universität Braunschweig, Institute of Automotive Management and Industrial Production, Chair of Production and Logistics
Christoph Johannes: Technische Universität Braunschweig, Institute of Automotive Management and Industrial Production, Chair of Production and Logistics
Thomas Stefan Spengler: Technische Universität Braunschweig, Institute of Automotive Management and Industrial Production, Chair of Production and Logistics
Journal of Business Economics, 2019, vol. 89, issue 6, No 7, 739-742
Abstract:
The author would like to correct the errors in the publication of the original article. The corrected details are given below for your reading.
Date: 2019
References: Add references at CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://link.springer.com/10.1007/s11573-018-0923-7 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:jbecon:v:89:y:2019:i:6:d:10.1007_s11573-018-0923-7
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/11573
DOI: 10.1007/s11573-018-0923-7
Access Statistics for this article
Journal of Business Economics is currently edited by Günter Fandel
More articles in Journal of Business Economics from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().