Two-stage parallel speed-scaling machine scheduling under time-of-use tariffs
Hongliang Zhang (),
Yujuan Wu (),
Ruilin Pan () and
Gongjie Xu ()
Additional contact information
Hongliang Zhang: Anhui University of Technology
Yujuan Wu: Anhui University of Technology
Ruilin Pan: Anhui University of Technology
Gongjie Xu: Anhui University of Technology
Journal of Intelligent Manufacturing, 2021, vol. 32, issue 1, No 7, 112 pages
Abstract:
Abstract As one of the demand-side programs, time-of-use (TOU) tariffs brings opportunities of maintaining power grid stability for electricity providers and chances of energy conservation for manufacturers, but it also brings challenge for enterprises to optimize scheduling schemes. This paper studies a two-stage parallel machine scheduling problem under TOU to minimize total electricity costs. The two-stage parallel machine system is composed of identical parallel speed-scaling machines at stage 1 and unrelated parallel machines at stage 2. The key issues lie in assigning a group of jobs to a set of parallel machines at each stage and choosing the appropriate processing speed for all jobs at stage 1, and then determining the interval of processing time for jobs on each selected machine. To solve this problem, a new continuous-time mixed-integer linear programming model is formulated. According to the characteristics of this model, a tabu search-greedy insertion hybrid (TS-GIH) algorithm is designed, which realizes job-machine assignment based on load balancing principle, job insertion with greedy mechanism as well as movement and speed adjustment strategies to find more suitable positions for jobs. The effectiveness of the proposed TS-GIH is demonstrated by comparing with CLPEX and improved genetic algorithm (IGA) through real-life and randomly generated instances. The results show that TS-GIH can realize the trade-off between computation time and solution quality. Compared with CLPEX, the computation time of TS-GIH is significantly less, and the solution quality is much better than IGA.
Keywords: Two-stage parallel machine scheduling; Time-of-use tariffs; Speed-scaling; Tabu search-greedy insertion hybrid algorithm; Electricity costs (search for similar items in EconPapers)
Date: 2021
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://link.springer.com/10.1007/s10845-020-01561-6 Abstract (text/html)
Access to the full text of the articles in this series is restricted.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:joinma:v:32:y:2021:i:1:d:10.1007_s10845-020-01561-6
Ordering information: This journal article can be ordered from
http://www.springer.com/journal/10845
DOI: 10.1007/s10845-020-01561-6
Access Statistics for this article
Journal of Intelligent Manufacturing is currently edited by Andrew Kusiak
More articles in Journal of Intelligent Manufacturing from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().