Time Period and Risk Measures in the General Risk Equation
James Bradley
Journal of Risk Research, 2007, vol. 10, issue 3, 355-369
Abstract:
In an earlier paper, a general risk equation, applicable to all non growth systems, and inclusive of financial systems, was derived. It related expected throughput capacity of any system to both system resources and positive risk of loss of throughput capacity. Two risk measures were required, a new MEL-risk measure, and the conventional standard-deviation risk measure. In this paper we show that the two apparently distinct risk measures are intimately related, and that which one is appropriate depends merely on the time period over which the risk is calculated. We show, ultimately by application of the Central Limit Theorem, that if we merely sufficiently alter the time period, at some point the need for one measure will transition into the need for the other, without any change in the underlying physical system. This leads to a comprehensive risk measure that defaults to either the MEL-risk measure, or standard-deviation measure, depending not on the physical system, but merely on the time period over which the risk is calculated.
Date: 2007
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://hdl.handle.net/10.1080/13669870701252232 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:jriskr:v:10:y:2007:i:3:p:355-369
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RJRR20
DOI: 10.1080/13669870701252232
Access Statistics for this article
Journal of Risk Research is currently edited by Bryan MacGregor
More articles in Journal of Risk Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().