Risk assessment for public–private partnership projects: using a fuzzy analytic hierarchical process method and expert opinion in China
Yan Li and
Xinyu Wang
Journal of Risk Research, 2018, vol. 21, issue 8, 952-973
Abstract:
Public–private partnerships (PPP) have been widely used in China to procure public facilities and services. Complicated problems in PPP projects in China arise because of a variety of risk factors. A proper risk assessment model is needed to identify risks and provide risk response strategies for future Chinese PPP projects. The fuzzy analytic hierarchy process (F-AHP) method provides the ability to solve complex risk assessment of PPP projects. Current risk assessment models are limited to PPP projects in specific countries and do not consider unique risks in China, especially political, economic, social, and legal risks. This paper designed a risk evaluation index system for PPP projects based on the Delphi expert investigation method, and then established an optimized risk evaluation model for PPP projects in China using the F-AHP method. The risks identified are confirmed by interviewing experts from Chinese local government departments, private enterprise, third-party intermediary consulting and regulatory agencies, and academic organizations. The results show that the risks that ranked among the top ten are closely related to China’s political and economic policies and relationships among stakeholders. It can be concluded that government authorities play a critical role in providing a favorable political, social, and economic environment and an effective institutional framework for PPP projects. Furthermore, it is also important to deal with relationships among stakeholders based on the public–private ‘win–win’ principle. This study provides risk response strategies, addressing key issues from eight aspects: an impeccable legal and regulatory framework; a central coordinating and regulating PPP authority; supportive governmental authorities; institutional capacity-building; favorable economic conditions and viability; community, partner, and moral accountability; clear division of responsibilities through contracts; and effective advisory management. These effective measures may be useful in reducing the adverse effects of risk for PPP projects in China.
Date: 2018
References: Add references at CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://hdl.handle.net/10.1080/13669877.2016.1264451 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:jriskr:v:21:y:2018:i:8:p:952-973
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/RJRR20
DOI: 10.1080/13669877.2016.1264451
Access Statistics for this article
Journal of Risk Research is currently edited by Bryan MacGregor
More articles in Journal of Risk Research from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().