A make-to-stock manufacturing system with component commonality: A queuing approach
Kwan Wee and
Maqbool Dada
IISE Transactions, 2010, vol. 42, issue 6, 435-453
Abstract:
In this article a manufacturing system that features component commonality and a production allocation mechanism that postpones inventory commitment is modeled. Under this mechanism, which is called the First-Use First-Serve (FUFS), approach, a component is committed to an order only when all other required components become available. Furthermore, production of a component can only occur if its inventory is below a threshold. The performance of the proposed model is compared with the benchmark case of the First-Come First-Served (FCFS) approach under the sequence in which orders are received. The presented results show that FUFS outperforms FCFS on most system performance criteria. However, FCFS may outperform FUFS under some performance measures of dispersion, when the workload is heavy.
Date: 2010
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://hdl.handle.net/10.1080/07408170903544322 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uiiexx:v:42:y:2010:i:6:p:435-453
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/uiie20
DOI: 10.1080/07408170903544322
Access Statistics for this article
IISE Transactions is currently edited by Jianjun Shi
More articles in IISE Transactions from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().