Optimally loading tow trains for just-in-time supply of mixed-model assembly lines
Simon Emde,
Malte Fliedner and
Nils Boysen
IISE Transactions, 2012, vol. 44, issue 2, 121-135
Abstract:
In today's mixed-model assembly production, there are two recent trends—namely, increasing vertical integration and the proliferation of product variety—that shift focus to an efficient just-in-time part supply. In this context, many automobile manufacturers set up decentralized logistics areas referred to as supermarkets. Here, small tow trains are loaded with parts and travel across the shop floor on specific routes to make frequent small-lot deliveries that are needed by the stations of the line. This article investigates the loading problem of tow trains, which aims at minimizing inventory near the line while avoiding material shortages given the limited capacity of the tow trains. An exact polynomial-time solution procedure is presented and interdependencies with production planning, that is, the sequencing problem of product models launched down the line, are investigated in a comprehensive computational study.
Date: 2012
References: Add references at CitEc
Citations: View citations in EconPapers (12)
Downloads: (external link)
http://hdl.handle.net/10.1080/0740817X.2011.575442 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uiiexx:v:44:y:2012:i:2:p:121-135
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/uiie20
DOI: 10.1080/0740817X.2011.575442
Access Statistics for this article
IISE Transactions is currently edited by Jianjun Shi
More articles in IISE Transactions from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().