Economic and statistical design of Vp control charts for finite-horizon processes
George Nenes,
Philippe Castagliola and
Giovanni Celano
IISE Transactions, 2017, vol. 49, issue 1, 110-125
Abstract:
In manufacturing environments where the production horizon for a specific product can be limited to a few hours or shifts, statistical process monitoring based on control charts is strategic to cut scrap, rework costs, and meet due dates. In this article, a Markov chain model is proposed to design a fully adaptive Shewhart control chart in a process with finite production horizon. The proposed Markov chain model allows the exact computation of several statistical performance metrics, as well as the expected cost of the monitoring and operation process for any adaptive Shewhart control chart with an unknown but finite number of inspections. Illustrative examples show the implementation of the Vp X‾$\bar{X}$ chart in short runs producing a finite batch of products.
Date: 2017
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://hdl.handle.net/10.1080/0740817X.2016.1206674 (text/html)
Access to full text is restricted to subscribers.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:taf:uiiexx:v:49:y:2017:i:1:p:110-125
Ordering information: This journal article can be ordered from
http://www.tandfonline.com/pricing/journal/uiie20
DOI: 10.1080/0740817X.2016.1206674
Access Statistics for this article
IISE Transactions is currently edited by Jianjun Shi
More articles in IISE Transactions from Taylor & Francis Journals
Bibliographic data for series maintained by Chris Longhurst ().