The Alaskan Labor Market during the Pipeline Era
William J Carrington
Journal of Political Economy, 1996, vol. 104, issue 1, 186-218
Abstract:
Built between 1974 and 1977, the Trans-Alaska Pipeline was the largest privately financed construction project in world history. The Alaskan labor-market during the pipeline era provides an ideal opportunity to view labor market responses to a large, anticipated, and temporary shock to labor demand. The paper presents several theoretical models of market responses to temporary demand shocks and then assesses the ability of each model to explain the Alaskan data. Among the findings are that Alaskan wages were very flexible and labor supply was quite elastic on both the intensive (hours per worker) and extensive (number of workers) margins. Copyright 1996 by University of Chicago Press.
Date: 1996
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (120)
Downloads: (external link)
http://dx.doi.org/10.1086/262022 full text (application/pdf)
Access to full text is restricted to subscribers. See http://www.journals.uchicago.edu/JPE for details.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ucp:jpolec:v:104:y:1996:i:1:p:186-218
Access Statistics for this article
More articles in Journal of Political Economy from University of Chicago Press
Bibliographic data for series maintained by Journals Division ().