The issues referred to planning and allocation of costs by branch-wise enterprises in the context of the crisis
Viktor Sidorenko () and
Yuliya Golskaya ()
Economy of region, 2010, vol. 1, issue 2, 203 - 207
Abstract:
Specifics of distribution of costs for investment and major repair by branch-wise enterprises have been considered. Optimization of cost planning of branch-wise enterprises on the basis of actual costs incurred in the previous periods, with work distribution related to major repair and investment taken into consideration, has been suggested in the paper.
Keywords: conveying system; railway transport; investment; branch-wise enterprises; planning (search for similar items in EconPapers)
Date: 2010
References: Add references at CitEc
Citations:
Downloads: (external link)
http://economyofregion.ru/Data/Issues/ER2010/June_2010/ERJune2010_203_207.pdf (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ura:ecregj:v:1:y:2010:i:2:p:203-207
Access Statistics for this article
More articles in Economy of region from Centre for Economic Security, Institute of Economics of Ural Branch of Russian Academy of Sciences
Bibliographic data for series maintained by Alexey Naydenov ().