Specification Considerations for the Price Variable in Travel Cost Demand Models
Frank A. Ward
Land Economics, 1984, vol. 60, issue 3, 301-305
Abstract:
Existing recreation demand models have paid much attention to the heterogeneous nature of the opportunity cost of time, but generally stipulate constant per mile costs in access price specifications. This study proposes two alternative approaches to ...
Date: 1984
References: Add references at CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.jstor.org/stable/pdfplus/3146191
A subscription is required to access pdf files. Pay per article is available.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:uwp:landec:v:60:y:1984:i:3:p:301-305
Access Statistics for this article
More articles in Land Economics from University of Wisconsin Press
Bibliographic data for series maintained by ().