The Cost of Electric Power Interruptions in the Industrial Sector: Estimates Derived from Interruptible Service Programs
Douglas W. Caves,
Joseph Herriges and
Robert J. Windle
Land Economics, 1992, vol. 68, issue 1, 49-61
Abstract:
The electric power industry has become increasingly interested in the value customers place upon service reliability, with the demand for reliability couched in terms of outage or shortage costs. The survey-based method of eliciting these costs dominates the literature. This paper explores and demonstrates a method for estimating outage and shortage costs based upon behavioral data. A discrete choice model is developed for estimating shortage costs using observed decisions of industrial customers regarding participation in interruptible service programs. The resulting shortage cost estimates of $4 per kWh unserved for a one-hour interruption are consistent with previous survey-based estimates.
Date: 1992
References: Add references at CitEc
Citations: View citations in EconPapers (32)
Downloads: (external link)
http://www.jstor.org/stable/pdfplus/3146742
A subscription is required to access pdf files. Pay per article is available.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:uwp:landec:v:68:y:1992:i:1:p:49-61
Access Statistics for this article
More articles in Land Economics from University of Wisconsin Press
Bibliographic data for series maintained by ().