EconPapers    
Economics at your fingertips  
 

Optimal Provision of Hydroelectric Power under Environmental and Regulatory Constraints

Brian Edwards, Silvio J. Flaim and Richard E. Howitt

Land Economics, 1999, vol. 75, issue 2, 267-283

Abstract: Hydroelectric power plants can quickly and inexpensively respond to changes in electricity demand. However, this operational flexibility can cause negative environmental impacts and these environmental effects are mitigated through direct restrictions on hydropower operations, rather than taxes or other marketbased mechanisms. A dynamic model of hydroelectric generation is used to derive hourly hydroelectric generation and purchases of replacement power to meet contract demand in the presence of these operational restrictions. The pattern of hydropower generation is shown to depend on differences between on-peak and off-peak spot electricity prices within the operational restrictions set by external regulatory mechanisms.

JEL-codes: Q25 Q28 Q4 (search for similar items in EconPapers)
Date: 1999
References: Add references at CitEc
Citations: View citations in EconPapers (20)

Downloads: (external link)
http://www.jstor.org/stable/pdfplus/3147010
A subscription is required to access pdf files. Pay per article is available.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:uwp:landec:v:75:y:1999:i:2:p:267-283

Access Statistics for this article

More articles in Land Economics from University of Wisconsin Press
Bibliographic data for series maintained by ().

 
Page updated 2025-03-28
Handle: RePEc:uwp:landec:v:75:y:1999:i:2:p:267-283