Balancing Environmental Protection and Energy Production in the Federal Hydropower Licensing Process
Lea-Rachel Kosnik
Land Economics, 2010, vol. 86, issue 3
Abstract:
The U.S. Federal Energy Regulatory Commission (FERC) must balance environmental protection of riverine resources with the nation’s growing demand for power production every time it issues a hydroelectric license. This paper models the bureaucratic agency’s decision-making process in issuing these licenses. Data on nearly 500 hydropower licenses issued from 1983 to 2005 are utilized. It is discovered that legislative and institutional constraints are, by far, the largest influences on FERC’s regulatory decisions, implying that if the current allocation of surface water in the United States is considered inefficient, the most effective way to alter this allocation is by passing new legislation, or by implementing institutional reform at FERC.
JEL-codes: Q25 Q42 (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (13)
Downloads: (external link)
http://le.uwpress.org/cgi/reprint/86/3/444
A subscription is required to access pdf files. Pay per article is available.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:uwp:landec:v:86:y:2010:iii:1:p444-466
Access Statistics for this article
More articles in Land Economics from University of Wisconsin Press
Bibliographic data for series maintained by ().