Note: “Simultaneous optimization of efficiency and performance balance measures in single‐machine scheduling problems”
Michael X. Weng and
Jose A. Ventura
Naval Research Logistics (NRL), 1996, vol. 43, issue 2, 313-318
Abstract:
n independent jobs are to be scheduled nonpreemptively on a single machine so as to minimize some performance measure. Federgruen and Mosheiov [2] show that a large class of such scheduling problems can be optimized by solving either a single instance or a finite sequence of instances of the so‐called SQC problem, in which all the jobs have a fixed or controllable common due date and the sum of general quasiconvex functions of the job completion times is to be minimized. In this note we point out that this is not always true. In particular, we show that the algorithm proposed in [2] does not always find a global optimal schedule to the problem of minimizing the weighted sum of the mean and variance of job completion times. © 1996 John Wiley & Sons, Inc.
Date: 1996
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://doi.org/10.1002/(SICI)1520-6750(199603)43:23.0.CO;2-W
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:wly:navres:v:43:y:1996:i:2:p:313-318
Access Statistics for this article
More articles in Naval Research Logistics (NRL) from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().