EconPapers    
Economics at your fingertips  
 

Risk Management of Domino Effects Considering Dynamic Consequence Analysis

Nima Khakzad, Faisal Khan, Paul Amyotte and Valerio Cozzani

Risk Analysis, 2014, vol. 34, issue 6, 1128-1138

Abstract: Domino effects are low‐probability high‐consequence accidents causing severe damage to humans, process plants, and the environment. Because domino effects affect large areas and are difficult to control, preventive safety measures have been given priority over mitigative measures. As a result, safety distances and safety inventories have been used as preventive safety measures to reduce the escalation probability of domino effects. However, these safety measures are usually designed considering static accident scenarios. In this study, we show that compared to a static worst‐case accident analysis, a dynamic consequence analysis provides a more rational approach for risk assessment and management of domino effects. This study also presents the application of Bayesian networks and conflict analysis to risk‐based allocation of chemical inventories to minimize the consequences and thus to reduce the escalation probability. It emphasizes the risk management of chemical inventories as an inherent safety measure, particularly in existing process plants where the applicability of other safety measures such as safety distances is limited.

Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (11)

Downloads: (external link)
https://doi.org/10.1111/risa.12158

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:wly:riskan:v:34:y:2014:i:6:p:1128-1138

Access Statistics for this article

More articles in Risk Analysis from John Wiley & Sons
Bibliographic data for series maintained by Wiley Content Delivery ().

 
Page updated 2025-03-20
Handle: RePEc:wly:riskan:v:34:y:2014:i:6:p:1128-1138