Asia-Pacific Journal of Operational Research (APJOR)
2004 - 2025
Current editor(s): Gongyun Zhao From World Scientific Publishing Co. Pte. Ltd. Bibliographic data for series maintained by Tai Tone Lim (). Access Statistics for this journal.
Is something missing from the series or not right? See the RePEc data check for the archive and series.
Volume 27, issue 06, 2010
- THE ALLOCATION OF CUSTOMERS IN A DISCRETE-TIME MULTI-SERVER QUEUEING SYSTEM pp. 649-667

- Wei Sun, Naishuo Tian and Shiyong Li
- PARALLEL MACHINE SCHEDULING WITH A SIMULTANEITY CONSTRAINT AND UNIT-LENGTH JOBS TO MINIMIZE THE MAKESPAN pp. 669-676

- Lin Lin, Yixun Lin, Xianwei Zhou and Ruyan Fu
- SHORTEST PATH SIMPLEX ALGORITHM WITH A MULTIPLE PIVOT RULE: A COMPARATIVE STUDY pp. 677-691

- A. Sedeño-Noda and C. González-Martín
- OPTIMAL DETERIORATING ITEMS INVENTORY MODEL WITH A THREE-ECHELON SUPPLY CHAIN STRATEGIC ALLIANCE pp. 693-711

- Jonas C. P. Yu
- A HYBRID PERMUTATION-CODED EVOLUTIONARY ALGORITHM FOR THE EARLY/TARDY SCHEDULING PROBLEM pp. 713-725

- Alok Singh
- A RETRIAL QUEUEING MODEL WITH MAP ARRIVALS, CATASTROPHIC FAILURES WITH REPAIRS, AND CUSTOMER IMPATIENCE pp. 727-752

- Srinivas R. Chakravarthy, Alexander N. Dudin and Valentina I. Klimenok
- OPTIMAL SELECTION OF PROGRAM SUPPLIERS FOR TV COMPANIES USING AN ANALYTIC NETWORK PROCESS (ANP) APPROACH pp. 753-767

- Sen-Kuei Liao, Kuei-Lun Chang and Tzeng-Wei Tseng
- ERRATUM: "ANALYSIS OF A MULTI-SERVER QUEUE WITH MARKOVIAN ARRIVALS AND SYNCHRONOUS PHASE TYPE VACATIONS" pp. 769-769

- Srinivas R. Chakravarthy
Volume 27, issue 05, 2010
- THEl1PENALTY FUNCTION METHOD FOR NONCONVEX DIFFERENTIABLE OPTIMIZATION PROBLEMS WITH INEQUALITY CONSTRAINTS pp. 559-576

- Tadeusz Antczak
- SOME IMPROVED ALGORITHMS ON THE SINGLE MACHINE HIERARCHICAL SCHEDULING WITH TOTAL TARDINESS AS THE PRIMARY CRITERION pp. 577-585

- Cheng He, Yixun Lin and Jinjiang Yuan
- STOCHASTIC MARKET-CLEARING OF JOINT ENERGY AND RESERVES AUCTIONS pp. 587-606

- J. Aghaei, H. A. Shayanfar and N. Amjady
- A NOTE ON AN EXTENDED NUMERATION METHOD FOR SOLVING FREE DISPOSAL HULL MODELS IN DEA pp. 607-610

- Mohammad Reza Alirezaee and Rashed Khanjani Shiraz
- A NOTE ON THE OPTIMAL SUPPLY CYCLE WHEN THE WHOLE PERIOD IS STOCKOUT pp. 611-616

- Miao-Sheng Chen and Ying-Chieh Chen
- TWO-STAGE FLOWSHOP SCHEDULING PROBLEMS WITH IDENTICAL AND BATCH PROCESSORS pp. 617-627

- Wen-Wei Wang, Long-Min He and Ming-Bao Cheng
- OPTIMAL SOLUTION STRUCTURE FOR MULTI-PERIOD PRODUCTION PLANNING WITH RETURNED PRODUCTS REMANUFACTURING pp. 629-648

- Yongjian Li, Jihong Zhang, Jian Chen and Xiaoqiang Cai
Volume 27, issue 04, 2010
- THE EFFECTS OF INFLATION AND TIME VALUE OF MONEY ON A PRODUCTION MODEL WITH A RANDOM PRODUCT LIFE CYCLE pp. 437-456

- Jonas C. P. Yu, Hui-Ming Wee, Gede A. Widyadana and Jer-Yuan Chang
- CAPACITATED TWO-STAGE TIME MINIMIZATION TRANSPORTATION PROBLEM pp. 457-476

- Vikas Sharma, Kalpana Dahiya and Vanita Verma
- FINANCIALLY OPTIMAL INVENTORY POLICIES WITH NON-LINEAR REPLENISHMENT COSTS pp. 477-492

- Jiang Zhang and Matthew J. Sobel
- SCHEDULING WITH DISCRETELY COMPRESSIBLE RELEASE DATES TO MINIMIZE MAKESPAN pp. 493-501

- Shu-Xia Zhang, Zhi-Gang Cao and Yu-Zhong Zhang
- SOME RESULTS ON A NEW CLASS OF SHOCK MODELS pp. 503-515

- Alagar Rangan and Ayşe Tansu
- DECOMPOSITION ALGORITHMS FOR THE INTERVAL SCHEDULING PROBLEM pp. 517-537

- Shidong Wang, Li Zheng and Zhihai Zhang
- INTEGRATED PRODUCTION MAINTENANCE MODEL UNDER IMPERFECT AGE-BASED MAINTENANCE POLICY AND NON-NEGLIGIBLE MAINTENANCE TIMES pp. 539-558

- Sami El-Ferik and Mohammed Ben-Daya
Volume 27, issue 03, 2010
- EFFICIENT NEIGHBORHOOD SEARCH FOR THE PROBABILISTIC MULTI-VEHICLE PICKUP AND DELIVERY PROBLEM pp. 301-314

- Patrizia Beraldi, Gianpaolo Ghiani, Roberto Musmanno and Francesca Vocaturo
- A MIXED-INTEGER LINEAR PROGRAMMING (MILP) MODEL FOR SHORT-RANGE PRODUCTION SCHEDULING OF CEMENT QUARRY OPERATIONS pp. 315-333

- Safi Ur Rehman and Mohammad Waqar Ali Asad
- MEAN VALUE ANALYSIS OF SINGLE SERVER RETRIAL QUEUES pp. 335-345

- J. R. Artalejo and J. A. C. Resing
- NEW SIMULATED ANNEALING ALGORITHMS FOR CONSTRAINED OPTIMIZATION pp. 347-367

- Linet Özdamar and Chandra Sekhar Pedamallu
- DEA PERFORMANCE MEASUREMENT OF THE NATIONAL INNOVATION SYSTEM IN ASIA AND EUROPE pp. 369-392

- Ta-Wei Pan, Shiu-Wan Hung and Wen-Min Lu
- INTEGRATED DYNAMIC PRICING FOR SEASONAL PRODUCTS WITH PRICE AND TIME DEPENDENT DEMAND pp. 393-410

- Subrata Saha and Manjusri Basu
- OPTIMAL MANPOWER PLANNING DECISION WITH SINGLE EMPLOYEE TYPE CONSIDERING MINIMAL EMPLOYMENT PERIOD CONSTRAINT pp. 411-436

- Yongjian Li, Jian Chen, Xiaoqiang Cai and Bengsheng Tu
Volume 27, issue 02, 2010
- AVERAGE OPTIONS FOR JUMP DIFFUSION MODELS pp. 143-166

- Hiroshi Kunita and Takuya Yamada
- ALTERNATIVE RANDOMIZATION FOR VALUING AMERICAN OPTIONS pp. 167-187

- Toshikazu Kimura
- THE VALUATION OF CALLABLE-PUTTABLE REVERSE CONVERTIBLE BONDS pp. 189-209

- Kyoko Yagi and Katsushige Sawaki
- COMPUTING BOUNDS ON RISK-NEUTRAL DISTRIBUTIONS FROM THE OBSERVED PRICES OF CALL OPTIONS pp. 211-225

- Michi Nishihara, Mutsunori Yagiura and Toshihide Ibaraki
- THE VALUATION OF RUSSIAN OPTIONS FOR DOUBLE EXPONENTIAL JUMP DIFFUSION PROCESSES pp. 227-242

- Atsuo Suzuki and Katsushige Sawaki
- PRICING AND CALIBRATION OF A CHOOSER FLEXIBLE CAP pp. 243-256

- Daisuke Ito, Masamitsu Ohnishi and Yasuhiro Tamba
- AN OPTIMAL MARKET ENTRY/EXIT EVALUATION MODEL WITH PARTIAL FINANCING FUNDS pp. 257-269

- Tyrone Lin, Chuan-Chuan Ko and Chien-Yu Liu
- IRREVERSIBLE INVESTMENT, OPERATING FLEXIBILITY, AND TIME LAGS pp. 271-286

- Ryuta Takashima, Makoto Goto and Motoh Tsujimura
- ESTIMATING BIVARIATE GARCH-JUMP MODEL BASED ON HIGH FREQUENCY DATA: THE CASE OF REVALUATION OF THE CHINESE YUAN IN JULY 2005 pp. 287-300

- Xinhong Lu, Ken-Ichi Kawai and Koichi Maekawa
Volume 27, issue 01, 2010
- A MAXIMAL PREDICTABILITY PORTFOLIO SUBJECT TO A TURNOVER CONSTRAINT pp. 1-13

- Yoshihiro Takaya and Hiroshi Konno
- SDP RELAXATIONS FOR QUADRATIC OPTIMIZATION PROBLEMS DERIVED FROM POLYNOMIAL OPTIMIZATION PROBLEMS pp. 15-38

- Martin Mevissen and Masakazu Kojima
- METRIC-PRESERVING REDUCTION OF EARTH MOVER'S DISTANCE pp. 39-54

- Yuichi Takano and Yoshitsugu Yamamoto
- A NONMONOTONE FILTER BARZILAI-BORWEIN METHOD FOR OPTIMIZATION pp. 55-69

- Yan Zhang, Wenyu Sun and Liqun Qi
- IMPROVED PROJECTED GRADIENT ALGORITHMS FOR SINGLY LINEARLY CONSTRAINED QUADRATIC PROGRAMS SUBJECT TO LOWER AND UPPER BOUNDS pp. 71-84

- Yun-Shan Fu and Yu-Hong Dai
- A CONVEX APPROXIMATION METHOD FOR LARGE SCALE LINEAR INEQUALITY CONSTRAINED MINIMIZATION pp. 85-101

- Hai-Jun Wang and Qin Ni
- SAMPLE AVERAGE APPROXIMATION METHODS FOR A CLASS OF STOCHASTIC VARIATIONAL INEQUALITY PROBLEMS pp. 103-119

- Huifu Xu
- EVALUATION OF THE ARROWS METHOD FOR CLASSIFICATION OF DATA pp. 121-142

- Lanting Lu and Christine S. M. Currie
Volume 26, issue 06, 2009
- TWO-MACHINE FLOW-SHOP MINIMUM-LENGTH SCHEDULING WITH INTERVAL PROCESSING TIMES pp. 715-734

- C. T. Ng, Natalja M. Matsveichuk, Yuri N. Sotskov and T. C. Edwin Cheng
- A DECOMPOSITION-COORDINATION METHOD FOR COMPLEX MULTI-OBJECTIVE SYSTEMS pp. 735-757

- F. Miguel, T. Gómez, M. Luque, F. Ruiz and R. Caballero
- AN EOQ MODEL FOR ITEMS WITH A FIXED SHELF-LIFE AND A DECLINING DEMAND RATE BASED ON TIME-TO-EXPIRY TECHNICAL NOTE pp. 759-767

- Tal Avinadav and Teijo Arponen
- CONVEX HULL PRESENTATION OF A QUADRATICALLY CONSTRAINED SET AND ITS APPLICATION IN SOLVING QUADRATIC PROGRAMMING PROBLEMS pp. 769-778

- Yong Xia
- ROBUST DYNAMIC PRICING OVER INFINITE HORIZON IN THE PRESENCE OF MODEL UNCERTAINTY pp. 779-804

- Gendao Li, Yu Xiong and Zhongkai Xiong
- RELIABILITY EVALUATION OF LINEAR CONSECUTIVE-WEIGHTED-k-OUT-OF-n:F SYSTEM pp. 805-816

- Serkan Eryilmaz and G. Yazgi Tutuncu
- A TABU SEARCH ALGORITHM FOR A PIPE-PROCESSING FLOWSHOP SCHEDULING PROBLEM MINIMIZING TOTAL TARDINESS IN A SHIPYARD pp. 817-829

- Xiaofeng Hu, Jingsong Bao and Ye Jin
- AN OPTIMAL BLOCK PREVENTIVE MAINTENANCE POLICY FOR A MULTI-UNIT SYSTEM CONSIDERING IMPERFECT MAINTENANCE pp. 831-847

- J. H. Park, S. C. Lee, J. W. Hong and C. H. Lie
Volume 26, issue 05, 2009
- A GOAL PROGRAMMING APPROACH TO FUZZY LINEAR REGRESSION WITH NON-FUZZY INPUT AND FUZZY OUTPUT DATA pp. 587-604

- H. Hassanpour, H. R. Maleki and M. A. Yaghoobi
- SELLER-BUYER RELATIONSHIP WHEN END DEMAND IS SENSITIVE TO PRICE AND PROMOTION pp. 605-621

- Maryam Esmaeili, Prakash L. Abad and Mir-Bahador Aryanezhad
- MOULIN REDUCTION, V-N REDUCTION AND AXIOMATIZATIONS OF THE DUPLICATE CORE pp. 623-636

- Yu-Hsien Liao
- RELIABILITY CENTERED MULTI OBJECTIVE HYBRID FLOW SHOP SCHEDULING pp. 637-653

- Tahmina Ferdousi Lipi, Md. Ahsan Akhtar Hasin and Md. Noor-E-Alam
- VARIABLE NEIGHBORHOOD SEARCH FOR ORDER BATCHING IN A WAREHOUSE pp. 655-683

- Maria Albareda-Sambola, Antonio Alonso-Ayuso, Elisenda Molina and Clara Simón de Blas
- A 4-DAY OR A 3-DAY WORKWEEKS SCHEDULING PROBLEM WITH A GIVEN WORKFORCE SIZE pp. 685-696

- Fethi Jarray
- FUNDAMENTAL MATRIX OF TRANSIENT QBD GENERATOR WITH FINITE STATES AND LEVEL DEPENDENT TRANSITIONS pp. 697-714

- Yang Woo Shin
Volume 26, issue 04, 2009
- A CONTINUATION APPROACH USING NCP FUNCTION FOR SOLVING MAX-CUT PROBLEM pp. 445-456

- Fengmin Xu, Chengxian Xu and Jiuquan Ren
- A RETAIL CATEGORY MANAGEMENT MODEL INTEGRATING SHELF SPACE AND INVENTORY LEVELS pp. 457-478

- B. Ramaseshan, N. R. Achuthan and R. Collinson
- ONE IMPROVED AGENT GENETIC ALGORITHM — RING-LIKE AGENT GENETIC ALGORITHM FOR GLOBAL NUMERICAL OPTIMIZATION pp. 479-502

- Bin Liu, Teqi Duan and Yongming Li
- A TWO-STAGE FLOWSHOP SCHEDULING WITH LIMITED BUFFER STORAGE pp. 503-522

- Ling-Huey Su, Dar-Li Yang and Hou-Kuan Chou
- STABILITY OF EXCESS DEMAND FUNCTIONS WITH RESPECT TO A STRONG VERSION OF WALD'S AXIOM pp. 523-532

- Phan Thanh An and Vuong Thi Thao Binh
- THE OPTIMAL INVENTORY CONTROL OF A SYSTEM WITH RANDOM LEAD TIME WHERE RANDOM SUPPLY INTERRUPTIONS AFFECT THE REPLENISHMENT pp. 533-557

- Yumei Hou and Qiang Zhang
- REDUCING COSTS OF SPARE PARTS SUPPLY SYSTEMS VIA STATIC PRIORITIES pp. 559-585

- I. J. B. F. Adan, A. Sleptchenko and G. J. van Houtum
Volume 26, issue 03, 2009
- BEAM SEARCH HEURISTICS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH LINEAR EARLINESS AND QUADRATIC TARDINESS COSTS pp. 319-339

- Jorge M. S. Valente
- STABILITY OF THE MULTI-TYPE REENTRANT LINES WITH TYPE PRIORITY SERVICE DISCIPLINE pp. 341-349

- Jiankui Yang
- THE NP-HARDNESS OF MINIMIZING THE TOTAL LATE WORK ON AN UNBOUNDED BATCH MACHINE pp. 351-363

- Jianfeng Ren, Yuzhong Zhang and Guo Sun
- AN INTERIOR POINT APPROACH FOR SEMIDEFINITE OPTIMIZATION USING NEW PROXIMITY FUNCTIONS pp. 365-382

- M. Reza Peyghami
- A SIMPLE ALGORITHM FOR THE BASIC(R, Q)INVENTORY CONTROL MODEL WITH RETURN FLOW pp. 383-398

- Huiqing Ouyang and Xiangyang Zhu
- ON TWO TYPES OF WARRANTIES: WARRANTY OF MALFUNCTIONING AND WARRANTY OF MISINFORMING pp. 399-420

- Dimitar Christozov, Stefanka Chukova and Plamen Mateev
- COMBINING PROCESS SELECTION AND LOT SIZING MODELS FOR PRODUCTION SCHEDULING OF ELECTROFUSED GRAINS pp. 421-443

- José Roberto Dale Luche, Reinaldo Morabito and Vitória Pureza
Volume 26, issue 02, 2009
- A PARTICLE SWARM OPTIMIZATION ALGORITHM ON JOB-SHOP SCHEDULING PROBLEMS WITH MULTI-PURPOSE MACHINES pp. 161-184

- Pisut Pongchairerks and Voratas Kachitvichyanukul
- AN EFFICIENTLY NOVEL MODEL FOR VEHICLE ROUTING PROBLEMS WITH STOCHASTIC DEMANDS pp. 185-197

- Selçuk Kürşat İşleyen and Ömer Faruk Baykoç
- VECTOR-VALUED IMPLICIT LAGRANGIAN FOR SYMMETRIC CONE COMPLEMENTARITY PROBLEMS pp. 199-233

- Lingchen Kong, Levent Tunçel and Naihua Xiu
- A HYBRID ADAPTIVE ALGORITHM FOR LINEAR OPTIMIZATION pp. 235-256

- Maziar Salahi and Tamás Terlaky
- A MULTI-CRITERIA PROCEDURE FOR THE USER INTERFACE COMPONENTS LAYOUT PROBLEM pp. 257-284

- S. K. Peer, Dinesh K. Sharma, K. Ravindranath and M. M. Naidu
- LINEAR PROGRAMMING TECHNIQUE TO SOLVE TWO PERSON MATRIX GAMES WITH INTERVAL PAY-OFFS pp. 285-305

- Prasun Kumar Nayak and Madhumangal Pal
- A BATCHING PROBLEM WITH LEARNING EFFECT CONSIDERATIONS pp. 307-317

- Wen-Hua Yang
Volume 26, issue 01, 2009
- A NEW FORMULATION AND RELAXATION OF THE SIMPLE PLANT LOCATION PROBLEM pp. 1-11

- R. R. K. Sharma and A. Muralidhar
- THE CONTINUOUS STOP LOCATION PROBLEM IN PUBLIC TRANSPORTATION NETWORKS pp. 13-30

- SCHöBEL Anita, Horst W. Hamacher, Annegret Liebers and Dorothea Wagner
- AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM pp. 31-58

- Weihua Zhou and Xiaobo Wu
- LINEARIZATION OF 0-1 MULTI-QUADRATIC FRACTIONAL PROGRAMMING PROBLEM pp. 59-84

- R. Kapoor and S. R. Arora
- ANALYSIS OF A MULTI-SERVER QUEUE WITH MARKOVIAN ARRIVALS AND SYNCHRONOUS PHASE TYPE VACATIONS pp. 85-113

- Srinivas R. Chakravarthy
- EXPLORING THE DIMENSIONALITY OF SERVICE QUALITY: AN APPLICATION OF TOPSIS IN THE INDIAN BANKING INDUSTRY pp. 115-133

- Manabendra N. Pal and Koushiki Choudhury
- SUPPLY CHAIN COORDINATION WITH CVaR CRITERION pp. 135-160

- Lei Yang, Minghui Xu, Gang Yu and Hanqin Zhang
| |