Performance measurement within a management control package
David Brown and
Teemu Malmi
Chapter 7 in Research Handbook on Performance Measurement for Management Control, 2024, pp 132-152 from Edward Elgar Publishing
Abstract:
In this chapter, we examine the role of five different performance measurement systems (PMS) within a management control package in a case study of a large multinational organization in the Asia-Pacific region. We explore how the PMS relate to each other, to other management controls, to strategy, and to activities. The case illustrates how the company managed its multiple and at times conflicting objectives (i.e., being ambidextrous), through the use of a package of controls, by establishing high levels of interdependencies between the incompatible objectives and specific PMS, and then ensuring these PMS had no relationship to each other. Further, our case demonstrates that despite an apparent design flaw in the organization’s PMS design, it did not lead to dysfunctional outcomes because the PMS and other forms of control acted in a compensatory manner. We conclude by suggesting avenues for further research.
Keywords: Business and Management; Economics and Finance (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.elgaronline.com/doi/10.4337/9781803920672.00017 (application/pdf)
Our link check indicates that this URL is bad, the error code is: 503 Service Temporarily Unavailable
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:elg:eechap:21441_7
Ordering information: This item can be ordered from
http://www.e-elgar.com
Access Statistics for this chapter
More chapters in Chapters from Edward Elgar Publishing
Bibliographic data for series maintained by Darrel McCalla ().