EconPapers    
Economics at your fingertips  
 

Integrating separate processes: English Steel Plate Mill

T. A. J. Nicholson

Chapter 10 in Managing Manufacturing Operations: A Casebook, 1978, pp 137-152 from Palgrave Macmillan

Abstract: Abstract In the English Steel reorganisation at the beginning of 1973, Dr Ron Vincent took over the responsibility for all production control activities in the Sheffield area. Vincent sets broad guidelines for the operations at each plant, fixes the sources of supply, and puts targets on stock turnover levels, delivery performance, and utilisation, while ‘line’ (equipment and running) responsibilities remain under individual plant managers. As Ron Vincent put it: ‘The plant managers have to keep output up regardless of what it is and the production controllers have to make sure that what comes out is the right stuff at the right time.’

Keywords: Production Control; Customer Order; Delivery Performance; Gantry Crane; Ground Slab (search for similar items in EconPapers)
Date: 1978
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:pal:palchp:978-1-349-15861-4_10

Ordering information: This item can be ordered from
http://www.palgrave.com/9781349158614

DOI: 10.1007/978-1-349-15861-4_10

Access Statistics for this chapter

More chapters in Palgrave Macmillan Books from Palgrave Macmillan
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:pal:palchp:978-1-349-15861-4_10