DEFINE: Parts 1 and 2
Reiner Hutwelker
Additional contact information
Reiner Hutwelker: SigmaLogic
Chapter 4 in Six Sigma Green Belt Certification Project, 2019, pp 41-59 from Springer
Abstract:
Abstract Of course, we start with the DEFINE phase. The purpose of the DEFINE phase is to define a critical output, identify the important unfulfilled requirements, describe its problems (Y), evaluate their monetary business relevance and define the targets, the scope and the team for the project. When I started my Six Sigma training in the 1990s, nobody really cared about the suitability of project topics. We received a topic from the management and often enough had to realize that it was not suitable for Six Sigma. Of course, you can almost always use one or the other DMAIC tool, but a Six Sigma project requires at least the use of the basic Six Sigma tools in their logical order, as we will do here. I wasted a lot of time on unsuitable projects and I have the impression that I am an expert on Six Sigma dead ends and project abysses. Therefore, I developed the tools Project-Topic and Project-Definition. They allow to involve every employee of a company in the identification of suitable project topics (Fig. 4.1).
Date: 2019
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-030-31915-1_4
Ordering information: This item can be ordered from
http://www.springer.com/9783030319151
DOI: 10.1007/978-3-030-31915-1_4
Access Statistics for this chapter
More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().