Drum, Buffer, Rope and Days of Inventory (DOI) Control
Gilad Issar and
Liat Ramati Navon
Chapter 5 in Operational Excellence, 2016, pp 21-24 from Springer
Abstract:
Abstract The theory of Constraint (Goldratt, The goal: A process of ongoing improvement, 1992) is subordinating the production line input and output material to the line bottleneck/constraint capacity. The line inventory in days (DOI), is optimized by using the TOC rules. The constraint’s daily output, the line’s Drum Beat, defines the amount of raw material which enters the line. Connecting the beginning of the line with a theoretical “rope” to the line’s constraint, with same Drum Beat- the same amount of material, governs the line entrance through the constraint. In order to secure the continuous feeding of the constraint, a buffer, a few days of work in process, is kept a step or two ahead of the constraint.
Keywords: Days of inventory; Constraint; Inventory; Drum beat; Buffer; Work in process (WIP) (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-319-20699-8_5
Ordering information: This item can be ordered from
http://www.springer.com/9783319206998
DOI: 10.1007/978-3-319-20699-8_5
Access Statistics for this chapter
More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().