EconPapers    
Economics at your fingertips  
 

Production Planning and Detailed Scheduling (PP/DS)

Hartmut Stadtler and Christopher Sürie
Additional contact information
Hartmut Stadtler: University of Hamburg
Christopher Sürie: SAP Deutschland AG & Co. KG

Chapter Chapter 6 in Advanced Planning in Supply Chains, 2012, pp 149-193 from Springer

Abstract: Abstract The module Production Planning/Detailed Scheduling (PP/DS) of SAP® APO is concerned with lot-sizing decisions at the production planning level and subsequently with sequencing and timing of these lot sizes on respective resources at the detailed scheduling level.

Keywords: Setup Time; Production Planning; Priority Rule; Production Order; Resource Constrain Project Schedule Problem (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-642-24215-1_7

Ordering information: This item can be ordered from
http://www.springer.com/9783642242151

DOI: 10.1007/978-3-642-24215-1_7

Access Statistics for this chapter

More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:mgmchp:978-3-642-24215-1_7