EconPapers    
Economics at your fingertips  
 

The “Introduction” Phase

Jürg Kuster, Eugen Huber, Robert Lippmann, Alphons Schmid, Emil Schneider, Urs Witschi and Roger Wüst

Chapter Chapter 13 in Project Management Handbook, 2015, pp 79-85 from Springer

Abstract: Abstract When the new service or product has been rolled out, the project organisation must be dissolved. This includes recognising what has been achieved, and learning any lessons from the project. The best way to do this is to review the project jointly with the project owner and the user once the solution has been in use for an agreed time. After completion of the project, the utilisation phase begins. Experience is gained at this stage which can be used to improve the existing solution, and which can be fed into the design of similar systems in the future.

Keywords: Project Owner; Project Organization; Introduction Phase; Credible Reports; Quality Management Guidelines (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-662-45373-5_13

Ordering information: This item can be ordered from
http://www.springer.com/9783662453735

DOI: 10.1007/978-3-662-45373-5_13

Access Statistics for this chapter

More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-01
Handle: RePEc:spr:mgmchp:978-3-662-45373-5_13