Surplus and Obsolescence Planning
Jörg Thomas Dickersbach and
Michael F. Passon
Chapter 7 in Service Parts Planning with SAP SCM™, 2015, pp 155-169 from Springer
Abstract:
Abstract The goal of surplus and obsolescence planning is to identify inventory within the supply network—i.e. the BOD—which exceeds the projected demand and therefore only consumes warehouse space. In order to identify the surplus and remove it from the concerned warehouses, first the total surplus within the supply network is determined. This is done based on the total expected demand (including a safety buffer) and the total available stock and the stock in transit. In a second step the total surplus is disaggregated—in other words, the surplus quantities for the individual locations are determined. If the value of the surplus is within the predefined limits, orders for scrapping the surplus are created automatically. In the other case the scrap orders need to be approved interactively. Figure 7.1 shows the overview of the surplus and obsolescence planning process.
Keywords: Supply Network; Safety Stock; Total Surplus; Retention Period; Service Part (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-662-45433-6_7
Ordering information: This item can be ordered from
http://www.springer.com/9783662454336
DOI: 10.1007/978-3-662-45433-6_7
Access Statistics for this chapter
More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().