Project Execution
Stefano Tonchia
Additional contact information
Stefano Tonchia: University of Udine
Chapter 18 in Industrial Project Management, 2018, pp 241-267 from Springer
Abstract:
Abstract Danieli’s case continues, presenting the project execution. The role of Project Manager is exemplified, together with the project organizational chart. Great attention is then on project control and reporting. The on-shore (on site) phase is told, till the contract closing. The case end with the risk monitoring practices.
Date: 2018
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-662-56328-1_18
Ordering information: This item can be ordered from
http://www.springer.com/9783662563281
DOI: 10.1007/978-3-662-56328-1_18
Access Statistics for this chapter
More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().