Abstract: Abstract This chapter is at the core of Project Management. Starting from the Project Charter and Project Scope, the Work Breakdown Structure (WBS) for ECC companies is addressed, together with good practices to make it. The linkages with other structures, such as OBS and BBS, are defined. The methodological steps of planning, control and reporting are presented, involving the variables of Time, Resources and Costs.

Keywords: Project Charter; Work Breakdown Structure (WBS); Product Breakdown Structure (PdBS); Structural Breakdown Process (PcBS); Job Contract (search for similar items in EconPapers)
Date: 2018
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-3-662-56328-1_7

Ordering information: This item can be ordered from
http://www.springer.com/9783662563281

DOI: 10.1007/978-3-662-56328-1_7

Access Statistics for this chapter

More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-11
Handle: RePEc:spr:mgmchp:978-3-662-56328-1_7