Case Study—Project Highway
Abhinav Mittal (),
Puneet Agrawal () and
Shuchi Agrawal
Additional contact information
Abhinav Mittal: YOG INFRA
Puneet Agrawal: ALA Legal
Chapter Chapter 6 in Hybrid Annuity Model (HAM) of Hybrid Public-Private Partnership Projects, 2023, pp 81-87 from Springer
Abstract:
Abstract The book uses a novel case-study based approach with 100+ numerical examples to explain and discuss contractual/commercial, taxation (direct and indirect taxes) and accounting aspects of Hybrid Annuity Model (HAM). A detailed financial model was prepared for the case study of Project Highway which was the bid financial model used for a real-life project and the values therein were subsequently modified. This financial model is used to explain the various concepts and computations in PART 3 of the book. This chapter provides an introduction to this case-study of Project Highway and a detailed list of assumptions including timeline, construction phasing, technical details, operation costs, capital structure (debt and equity assumptions), macroeconomics (inflation), tax rates etc.
Date: 2023
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-981-19-2019-6_6
Ordering information: This item can be ordered from
http://www.springer.com/9789811920196
DOI: 10.1007/978-981-19-2019-6_6
Access Statistics for this chapter
More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().