EconPapers    
Economics at your fingertips  
 

Case Study—Project Highway

Abhinav Mittal (), Puneet Agrawal () and Shuchi Agrawal
Additional contact information
Abhinav Mittal: YOG INFRA
Puneet Agrawal: ALA Legal

Chapter Chapter 6 in Hybrid Annuity Model (HAM) of Hybrid Public-Private Partnership Projects, 2023, pp 81-87 from Springer

Abstract: Abstract The book uses a novel case-study based approach with 100+ numerical examples to explain and discuss contractual/commercial, taxation (direct and indirect taxes) and accounting aspects of Hybrid Annuity Model (HAM). A detailed financial model was prepared for the case study of Project Highway which was the bid financial model used for a real-life project and the values therein were subsequently modified. This financial model is used to explain the various concepts and computations in PART 3 of the book. This chapter provides an introduction to this case-study of Project Highway and a detailed list of assumptions including timeline, construction phasing, technical details, operation costs, capital structure (debt and equity assumptions), macroeconomics (inflation), tax rates etc.

Date: 2023
References: Add references at CitEc
Citations:

There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:spr:mgmchp:978-981-19-2019-6_6

Ordering information: This item can be ordered from
http://www.springer.com/9789811920196

DOI: 10.1007/978-981-19-2019-6_6

Access Statistics for this chapter

More chapters in Management for Professionals from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().

 
Page updated 2025-04-11
Handle: RePEc:spr:mgmchp:978-981-19-2019-6_6