Batch Small Scope Change Requests for Sponsor Approval
Tom Mochal and
Jeff Mochal
Chapter Chapter 29 in Lessons in Project Management, 2011, pp 123-126 from Springer
Abstract:
Abstract I can sympathize with Sean. He thinks he has done a good job establishing scope, and he is prepared to handle scope changes by taking the change requests to the sponsor, along with the project impact assessment. However, he also knows the sponsor is busy and thus hesitates to bother him with “minor” scope changes. Sean is probably right. Most likely, the sponsor does not want to be bothered with every two- and four-hour scope change request. There are a couple alternatives, however.
Date: 2011
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-1-4302-3835-5_30
Ordering information: This item can be ordered from
http://www.springer.com/9781430238355
DOI: 10.1007/978-1-4302-3835-5_30
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().