Negotiating Feasible Requirements
Robert F. Bordley ()
Additional contact information
Robert F. Bordley: University of Michigan, Systems Engineering and Design Program, Industrial and Operations Engineering Department, College of Engineering
Chapter Chapter 5 in Managing Project Complexity and Risk with Systems Engineering, 2026, pp 49-58 from Springer
Abstract:
Abstract The systems engineer will inevitably make tradeoffs between what stakeholders want and what is technically feasible. But there were also be tradeoffs between satisfying different stakeholders with conflicting agendas. The Woodrow Wilson bridgeWoodrow wilson bridge highlighted the multiple conflicting stakeholders. Commuters and drivers of long haul trucks suffered delays in crossing the bridge when the drawbridge was opened. Sailors suffered delays in crossing the bridge when the drawbridge was closed. All groups would benefit from a very tall bridge that allowed ships to cross without a drawbridge opening. But residents of Alexandria opposed increasing the bridge’s height.
Date: 2026
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-032-08901-4_5
Ordering information: This item can be ordered from
http://www.springer.com/9783032089014
DOI: 10.1007/978-3-032-08901-4_5
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().