Successful Process and Performance Controlling in the Power Supply Industry by SÜWAG Energie
André Dreißen and
Rainer Heinrichs
Additional contact information
André Dreißen: IDS Scheer AG
Rainer Heinrichs: Süwag Energie AG
A chapter in Corporate Performance Management, 2006, pp 65-76 from Springer
Abstract:
Summary SÜWAG Energie AG took the decision to implement a program continuous process and system optimization of its business processes based on ARIS Process Performance Manager. The service processes at four different locations were selected for Performance Monitoring with a standardized, software-supported process controlling system. After just two months, the first substantiated analysis based on SAP IS-U were available, so that process improvement measures could be initiated.
Keywords: Quality key performance indicators; complaints quota; energy industry; SAP IS-U; process mining; implausible meter reading results; customer segments; disruption factor analysis; anomaly analyses; process controlling tool (search for similar items in EconPapers)
Date: 2006
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-540-30787-7_5
Ordering information: This item can be ordered from
http://www.springer.com/9783540307877
DOI: 10.1007/3-540-30787-7_5
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().