A Synthetic Measure for the Assessment of the Project Performance
Antonella Certa (),
Mario Enea () and
Antonio Giallanza ()
Additional contact information
Antonella Certa: Università degli Studi di Palermo
Mario Enea: Università degli Studi di Palermo
Antonio Giallanza: Università degli Studi di Palermo
Chapter Chapter 11 in Business Performance Measurement and Management, 2010, pp 167-180 from Springer
Abstract:
Abstract The present paper aims to offer a synthetic project performance indicator (PPI) that aggregates two input parameters obtained by the Earned Value Analysis. The PPI is calculated by using a Fuzzy Inference System (FIS) able to single out a measure based on the input parameters, instead of formulating a mathematical model that could be a troublesome task whenever complex relations among the input variables exist. The purpose is to communicate the project performance to the stakeholders in a clear and complete way, for example, describing the PPI by means of contour lines.
Date: 2010
References: Add references at CitEc
Citations: View citations in EconPapers (1)
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:sprchp:978-3-642-04800-5_11
Ordering information: This item can be ordered from
http://www.springer.com/9783642048005
DOI: 10.1007/978-3-642-04800-5_11
Access Statistics for this chapter
More chapters in Springer Books from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().