Advanced Methods in Uncertainty Management
Ajit Kumar Verma (),
Srividya Ajit () and
Durga Rao Karanki ()
Additional contact information
Ajit Kumar Verma: Stord/Haugesund University College
Srividya Ajit: Stord/Haugesund University College
Durga Rao Karanki: Paul Scherrer Institute
Chapter Chapter 14 in Reliability and Safety Engineering, 2016, pp 493-554 from Springer
Abstract:
Abstract Uncertainty management encompasses identification and characterizing elementary uncertainties, propagation of model input uncertainties, and prioritizing the measures to reduce the uncertainties. This chapter primarily focuses on complex issues in uncertainty management such as treating correlations among uncertain parameters, separating epistemic and aleatory uncertainties, and ranking the parameters. Alternative uncertainty methods, Dempster-Shafer approach and probability bounds based approach, are discussed with a few numerical examples. Further, a comparison of different approaches on a plant case study is presented, where the benefits and limitations of each approach are given.
Keywords: Fuzzy Number; Uncertainty Propagation; Circuit Breaker; Uncertain Variable; Epistemic Uncertainty (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:spr:ssrchp:978-1-4471-6269-8_14
Ordering information: This item can be ordered from
http://www.springer.com/9781447162698
DOI: 10.1007/978-1-4471-6269-8_14
Access Statistics for this chapter
More chapters in Springer Series in Reliability Engineering from Springer
Bibliographic data for series maintained by Sonal Shukla () and Springer Nature Abstracting and Indexing ().