Optimal Project Management
Alessandro Bonatti,
Doruk Cetemen and
Juuso Toikka
Papers from arXiv.org
Abstract:
We study optimal dynamic contracts for long-term projects where a risk-averse agent exerts hidden effort to increase the drift of a Brownian process toward a com- pletion threshold. Relative to the first best, the optimal contract slows progress, makes success less likely, induces earlier termination, and narrows project scope. Allowing for costly project resets generates further distortions: resets may be excessive or insufficient depending on the residual effort required afterwards. With endogenous risk taking, optimal incentives introduce penalties for failure and reduce rewards for effort above a critical progress level, resulting in discontinuous and nonmonotonic effort in progress. In the baseline model, the optimal contract can be implemented with linear spot contracts that require no long-term commitment.
Date: 2026-09
New Economics Papers: this item is included in nep-mic and nep-ppm
References: Add references at CitEc
Citations:
Downloads: (external link)
https://arxiv.org/pdf/2609.35238 Latest version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:arx:papers:2609.35238
Access Statistics for this paper
More papers in Papers from arXiv.org
Bibliographic data for series maintained by arXiv administrators ().