Risk Ceilings and Development Deadlines: Pacing AI under Uncertain Safety Productivity
Li Gan
Papers from arXiv.org
Abstract:
Can a regulator promise both a risk ceiling and a development deadline when safety productivity is unknown? A ceiling below the final model's unprotected hazard requires a minimum stock of safety knowledge, so both promises hold only if weak research can be ruled out. Learning first and then replaying development, with spare compute in safety, comes close to that minimum. In a calibration with only state risk, constant safety yield, and full knowledge transfer, it needs only 3.3 percent more productivity than the necessary bound. Customer services pay for the guarantee. Rules that fix compute allocation fix dates, not risk.
Date: 2026-10
References: Add references at CitEc
Citations:
Downloads: (external link)
https://arxiv.org/pdf/2610.11093 Latest version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:arx:papers:2610.11093
Access Statistics for this paper
More papers in Papers from arXiv.org
Bibliographic data for series maintained by arXiv administrators ().