EconPapers    
Economics at your fingertips  
 

Electricity infrastructure- More border crossings or a borderless Europe?

Georg Zachmann ()

Policy Contributions from Bruegel

Abstract: We propose that first, vertical unbundling needs to be completed. Second, to ensure the reliable operation of the meshed European electricity system a European control centre should be established. Third, a truly European and binding network infrastructure planning process should be established. It should be transparent and open in order to ensure the synchronisation of investment.The outcome should be democratically legitimised. Finally, networks should be joint-funded by all benefiting parties,...

Date: 2013-02
New Economics Papers: this item is included in nep-ene, nep-eur and nep-reg
References: Add references at CitEc
Citations: View citations in EconPapers (1) Track citations by RSS feed

Downloads: (external link)
https://www.bruegel.org/wp-content/uploads/importe ... c_2013_05_elec__.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:bre:polcon:772

Access Statistics for this paper

More papers in Policy Contributions from Bruegel Contact information at EDIRC.
Bibliographic data for series maintained by Bruegel ().

 
Page updated 2021-10-11
Handle: RePEc:bre:polcon:772