Cost Overrun at the Norwegian Continental Shelf: The Element of Surprise
Atle Oglend,
Petter Osmundsen and
Sindre Lorentzen
No 5886, CESifo Working Paper Series from CESifo
Abstract:
We examine drivers of cost overruns in Norwegian development projects in the oil and gas sector. The multivariate longitudinal econometric analysis employs a unique and detailed dataset consisting of 80 different projects between 2000 and 2015. Among the significant results, we find that the unexpected change in economic activity has a positive effect on the overruns; there is a considerable positive momentum in the transitional cost overruns; more experienced operators tend to incur less overruns; finally, that the size of the investment of the projects has a positive impact on the overruns. Further, we find evidence that the current economic activity matters to an extent, but it is the unexpected change in activity that is the pivotal factor.
Keywords: cost overrun; cost estimation; estimation error (search for similar items in EconPapers)
JEL-codes: C31 C51 D22 (search for similar items in EconPapers)
Date: 2016
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://www.cesifo.org/DocDL/cesifo1_wp5886.pdf (application/pdf)
Related works:
Working Paper: Cost Overrun at the Norwegian Continental Shelf: The element of surprise (2016) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:ces:ceswps:_5886
Access Statistics for this paper
More papers in CESifo Working Paper Series from CESifo Contact information at EDIRC.
Bibliographic data for series maintained by Klaus Wohlrabe ().