Organizational Capacity and Project Dynamics
Dana Foarta and
Michael Ting
No 17817, CEPR Discussion Papers from Centre for Economic Policy Research
Abstract:
This paper develops a dynamic theory of the interaction of organizational capacity and its institutional context. Higher capacity enables organizations to deliver projects efficiently, while institutional barriers allow opposing interests to reallocate project payoffs at the cost of delays. Projects that are small and distributionally unequal are vulnerable to revisions. Project designers avoid revisions by equalizing distributive benefits or inflating project scales to increase the cost of revisions. We show that ``matched" levels of capacity and institutional barriers minimize welfare. Organizational systems with high capacity and low institutional barriers, or low capacity and high institutional barriers, generate more efficient outcomes.
Keywords: Organizational capacity; Revisions; Delays; Institutions; Transitions (search for similar items in EconPapers)
JEL-codes: D73 D82 (search for similar items in EconPapers)
Date: 2023-01
References: Add references at CitEc
Citations:
Downloads: (external link)
https://cepr.org/publications/DP17817 (application/pdf)
Related works:
Working Paper: Organizational Capacity and Project Dynamics (2023) 
Working Paper: Organizational capacity and project dynamics (2023) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cpr:ceprdp:17817
Ordering information: This working paper can be ordered from
https://cepr.org/publications/DP17817
Access Statistics for this paper
More papers in CEPR Discussion Papers from Centre for Economic Policy Research 33 Great Sutton Street, London EC1V 0DX, UK.
Bibliographic data for series maintained by CEPR ().