Tweaking and the Horndal effect
Yossi Spiegel and
Igal E Hendel
No 9289, CEPR Discussion Papers from Centre for Economic Policy Research
Abstract:
We document the evolution of productivity in a steel mini mill with fixed capital, producing an unchanged product with Leontief technology. Despite the fact that production conditions did not change dramatically, production doubles within the sample period (almost 12 years). We decompose the gains into: downtime reductions, more rounds of production per time, and more output per run. After attributing productivity gains to investment and an incentive plan, we are left with a large unexplained component. Learning by experimentation, or tweaking, seems to be behind the continual and gradual process of productivity growth. The findings suggest that capacity is not as well de?ned, even in batch-oriented manufacturing.
Date: 2013-01
References: View references in EconPapers View complete reference list from CitEc
Citations:
Downloads: (external link)
https://cepr.org/publications/DP9289 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cpr:ceprdp:9289
Ordering information: This working paper can be ordered from
https://cepr.org/publications/DP9289
Access Statistics for this paper
More papers in CEPR Discussion Papers from Centre for Economic Policy Research 33 Great Sutton Street, London EC1V 0DX, UK.
Bibliographic data for series maintained by CEPR ().