Production process heterogeneity, time to build, and macroeconomic performance
Mario Amendola (),
Jean-Luc Gaffard and
Francesco Saraceno ()
Additional contact information
Mario Amendola: UNIROMA - Università degli Studi di Roma "La Sapienza" = Sapienza University [Rome]
Francesco Saraceno: OFCE - Observatoire français des conjonctures économiques (Sciences Po) - Sciences Po - Sciences Po
SciencePo Working papers Main from HAL
Abstract:
This paper describes the out-of-equilibrium approach to the analysis of economic processes. We argue that such an approach is adapted to study qualitative (or structural) changes, like technical progress or changes in preferences. Truly sequential analyses manage to capture the essential features of qualitative change. In particular, we show how this approach shifts the focus from the issue of optimality to the one of viability of the processes of change. The objective of the paper is, first, to highlight the analytical elements of an out-of-equilibrium approach, so as to serve as a guide for the construction of this type of models; second to show, how this analysis allows to see controversial phenomena, like for example the debate on wage rigidity or the productivity paradox in a new and different light ; third to identify the real causes of the on-going crisis.
Keywords: Out-of-equilibrium; Structural change; Credit constraints; Agent-based models; Adaptive expectations; Time-to-build; Sequential analysis; Macroeconomic policy; Productivity paradox; Wage rigidity (search for similar items in EconPapers)
Date: 2012-09
Note: View the original document on HAL open archive server: https://sciencespo.hal.science/hal-01053563v1
References: View references in EconPapers View complete reference list from CitEc
Citations:
Published in Revue de l'OFCE, 2012, 5 (124), pp.263-294. ⟨10.3917/reof.124.0263⟩
Downloads: (external link)
https://sciencespo.hal.science/hal-01053563v1/document (application/pdf)
Related works:
Journal Article: Production Process Heterogeneity, Time to Build, and Macroeconomic Performance (2012) 
Working Paper: Production process heterogeneity, time to build, and macroeconomic performance (2012) 
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:spmain:hal-01053563
DOI: 10.3917/reof.124.0263
Access Statistics for this paper
More papers in SciencePo Working papers Main from HAL
Bibliographic data for series maintained by Contact - Sciences Po Departement of Economics ().