EconPapers    
Economics at your fingertips  
 

Two Approaches to the Problem of Sharing Delay Costs in Joint Projects

R. Brânzei, G. Ferrari, Vito Fragnelli () and S.H. Tijs
Additional contact information
R. Brânzei: Tilburg University, Center For Economic Research
S.H. Tijs: Tilburg University, Center For Economic Research

No 2001-22, Discussion Paper from Tilburg University, Center for Economic Research

Keywords: activity graph; bankruptcy problem; taxation problem; serial cost sharing method; delay cost (search for similar items in EconPapers)
Date: 2001
References: Add references at CitEc
Citations:

Downloads: (external link)
https://repository.tilburguniversity.edu/bitstream ... a0ed21b185f/download (application/pdf)

Related works:
Journal Article: Two Approaches to the Problem of Sharing Delay Costs in Joint Projects (2002) Downloads
Working Paper: Two approaches to the problem of sharing delay costs in joint projects (2002) Downloads
Working Paper: Two Approaches to the Problem of Sharing Delay Costs in Joint Projects (2001) Downloads
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:tiu:tiucen:0c51f267-e6c5-4d4e-a05f-d649c66b6115

Access Statistics for this paper

More papers in Discussion Paper from Tilburg University, Center for Economic Research
Bibliographic data for series maintained by Richard Broekman ().

 
Page updated 2025-04-01
Handle: RePEc:tiu:tiucen:0c51f267-e6c5-4d4e-a05f-d649c66b6115