A real-time conflict solution algorithm for the train rescheduling problem
Andrea Bettinelli,
Alberto Santini and
Daniele Vigo
Transportation Research Part B: Methodological, 2017, vol. 106, issue C, 237-265
Abstract:
We consider the real-time resolution of conflicts arising in real-world train management applications. In particular, given a nominal timetable for a set of trains and a set of modifications due to delays or other resources unavailability, we are aiming at defining a set of actions which must be implemented to grant safety, e.g., to avoid potential conflicts such as train collisions or headway violations, and restore quality by reducing the delays. To be compatible with real-time management, the required actions must be determined in a few seconds, hence specialized fast heuristics must be used.
Keywords: Railway optimization; Train rescheduling; Real-time algorithm; Heuristic (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0191261516301151
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:transb:v:106:y:2017:i:c:p:237-265
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
DOI: 10.1016/j.trb.2017.10.005
Access Statistics for this article
Transportation Research Part B: Methodological is currently edited by Fred Mannering
More articles in Transportation Research Part B: Methodological from Elsevier
Bibliographic data for series maintained by Catherine Liu ().