Rolling stock scheduling with maintenance requirements at the Chinese High-Speed Railway
Qingwei Zhong,
Richard M. Lusby,
Jesper Larsen,
Yongxiang Zhang and
Qiyuan Peng
Transportation Research Part B: Methodological, 2019, vol. 126, issue C, 24-44
Abstract:
Efficient rolling stock schedules have always been the focus of railway companies. At the Chinese High-Speed Railway, rolling stock scheduling is usually done manually by dispatchers. Such an approach often makes it difficult to quickly obtain an optimal rolling stock schedule that can be used to operate the proposed timetable and which is also feasible with respect to the rolling stock maintenance requirements. In this paper, we consider the problem of rolling stock scheduling with maintenance requirements and propose a heuristic approach that decomposes the problem into two main stages. In the first stage, the maintenance restrictions are ignored and a conventional Mixed Integer Programming model is used to generate multiple candidate rolling stock schedules. In the second stage, we check to see whether any of the candidate rolling stock schedules are feasible when maintenance restrictions for the individual rolling stock units are also considered. Checking a candidate rolling stock schedule can be performed using an assignment problem. To provide some structure to the search, candidate rolling stock schedules generated in the first stage are sorted in descending order according to their objective values. The two stages can be iteratively performed to avoid generating all schedules in the first stage before proceeding to the second stage. We analyze the performance of the proposed approach on real-life instances provided by the Chinese High-Speed Railway. These instances focus on the railway network within the Zhengzhou Group, which is one of the busiest transportation networks in China. Comparisons with the manual approach that is currently used in practice show that the proposed approach yields far superior schedules. The optimized schedules improve rolling stock efficiency and lead to a reduction in operating cost of approximately 10.5%.
Keywords: High-speed railway; Rolling stock scheduling; Maintenance requirements (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (16)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0191261518309330
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:transb:v:126:y:2019:i:c:p:24-44
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
DOI: 10.1016/j.trb.2019.05.013
Access Statistics for this article
Transportation Research Part B: Methodological is currently edited by Fred Mannering
More articles in Transportation Research Part B: Methodological from Elsevier
Bibliographic data for series maintained by Catherine Liu ().