Optimal selection of build–operate-transfer projects on transportation networks
Di Wu,
Yafeng Yin and
Siriphong Lawphongpanich
Transportation Research Part B: Methodological, 2011, vol. 45, issue 10, 1699-1709
Abstract:
This paper considers the problem of how to select highway projects for the build–operate-transfer (BOT) development with the objective of improving the social benefit while ensuring the marketability of those selected. The problem can be viewed as a tri-level leader–follower game and is formulated as a mixed integer program with equilibrium constraints. Without solving the associated problem, we show that optimal tolls and travel times on selected BOT highways can be determined from their attributes under mild assumptions. This leads to an efficient heuristic algorithm for solving the project selection problem.
Keywords: Build–operate-transfer scheme; Mathematical program with equilibrium constraints; Network modeling; Pricing (search for similar items in EconPapers)
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0191261511001068
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:transb:v:45:y:2011:i:10:p:1699-1709
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
DOI: 10.1016/j.trb.2011.07.006
Access Statistics for this article
Transportation Research Part B: Methodological is currently edited by Fred Mannering
More articles in Transportation Research Part B: Methodological from Elsevier
Bibliographic data for series maintained by Catherine Liu ().