Overprocurement of balancing capacity may increase the welfare in the cross-zonal energy-reserve coallocation problem
D\'avid Csercsik and
\'Ad\'am Sleisz
Papers from arXiv.org
Abstract:
When the traded energy and reserve products between zones are co-allocated to optimize the infrastructure usage, both deterministic and stochastic flows have to be accounted for on interconnector lines. We focus on allocation models, which guarantee deliverability in the context of the portfolio bidding European day-ahead market framework, assuming a flow-based description of network constraints. In such models, as each unit of allocated reserve supply implies additional cost, it is straightforward to assume that the amount of allocated reserve is equal to the accepted reserve demand quantity. However, as it is illustrated by the proposed work, overprocurement of reserves may imply counterintuitive benefits. Reserve supplies not used for balancing may be used for congestion management, thus allowing valuable additional flows in the network.
Date: 2025-10
New Economics Papers: this item is included in nep-net and nep-reg
References: Add references at CitEc
Citations:
Downloads: (external link)
http://arxiv.org/pdf/2511.01877 Latest version (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:arx:papers:2511.01877
Access Statistics for this paper
More papers in Papers from arXiv.org
Bibliographic data for series maintained by arXiv administrators ().